加熱爐9B蓄熱式燃燒器更換安裝
Regenerative burner replacement and installation work for heating furnace
Regenerative burner replacement and installation work for heating furnace
Fabrication and installation work for acid regeneration plant fixing plate, cyclone separator tower equipment, roaster flue, roaster, ferric oxide tank flue, and ferric oxide tank
Fabrication work for SPM#1  tempering conditioner auxiliary equipment
CO control funnel, dust evacuation funnel, DENOx denitrification control funnel fabrication and installation work
Duct and tunnel fabrication and installation work
Brackets fabrication and installation work
Pickling plant fabrication and installation work at WALSIN
Storage tank fabrication and installation work
Offshore wind fram, Yunlin TP secondary steel structure component fabrication and installation project
Fabrication and installation project of transit rail for 50 tons furnace
Installation work of alloy material adding machine at 50 tons furnace plant
Roasting machine and deodorizing machine equipment installation workat UCC company at Douliou,Yunlin
Heating and adding system equipment installation work at Universal Cement Corporation
ET/UT Inspection Device Conveyor Equipment
CSAC Collecting System for Aluminum Chip Breaking Line
Tai-Power Ta-Lin Plant Boiler's Building
X-Ray Profile Assembly
Platform and Hand Rail Fabricate Installation
The Equipment of Skin Pass Line Fabrication for YUSCO.
Mixer System Fabrication & Installation Work for Waste Water Area
Conveyor System Fabrication and Installation Work
B.A Renew and Equipment Fabrication Work
Piping Work and Erection for SUS 4 Feet Strip Cold Mill (JAPAN Mistsubshi)